At the moment work on the house seems to be progressing at a snail's pace - there's a lot being done, but finishing work is probably the most time-consuming work, and some jobs have been held up by miscalculations in materials, which must be shipped over from Lucena - a process which always takes a long time!

That said, the attic room is beginning to take shape - as the photos here show - the ceiling frame and panels are really complicated! Interior painting has been started too, and the bathroom tiling is mostly ready (though currently at a halt because the supplier in Lucena sent the wrong quantities of tiles).



We've had our well dug - it was quite a funny process - and very 'manual' in the filipino style - a pipe was given a pointed end, by cutting out sections with a hacksaw, beating it to a rough point, and welding the edges together. The area behind the tip was then made into a sort of rough filter, by punching holes through the pipe - not with a drill as one might expect, but by hammering a nail through the metal repeatedly! The pipe was then driven into the ground by force of lots of hammering and the occasional twist with a wrench. Incredibly water does come through, and at quite a good rate!

Also, last weekend a surveyor came over (he was meant to come the weekend before, but in the filipino idiom, didn't show up and switched off his mobile phone) and marked out the actual boundaries of the property, so now I can have a fence put up without borrowing bits of my neighbour's property..